Water treatment plant, Eindhoven, Netherlands

  • Typ obiektu:
  • Obiekty przemysłowe
  • Obiekty infrastrukturalne
Pełny ekran Zamknij Street View

For the raising of the sedimentation basin within the sewage treatment plant in Eindhoven, the precast elements are connected to each other in a fast and efficient way with the Peikko SUMO® wall shoe connection. 

This dry connection consists of a SUMO® Wall shoe cast in one element and an HPM® anchor bolt cast in the other element. Together this forms the wall shoe joint that absorbs tensile loads. To provide protection against corrosion, the connections are galvanized in this project.

Informacje o projekcie

Deweloper:
Waterschap De Dommel
Generalny Wykonawca:
Van Boekel Bouw & Infra
Zakład prefabrykacji:
Haitsma Beton
Rok realizacji dostaw:
2019
Zakończenie budowy:
2020

Kontakt