Institut Quantique, Sherbrooke University, Sherbrooke, Canada

  • Typ obiektu:
  • Obiekty szkolnictwa i kultury
Pełny ekran Zamknij

DELTABEAM® With Mass Timber Project in Quebec, Canada.

The Institut Quantique’s newest pavilion is as cutting-edge as the Institute’s notable and important research on quantum physics. The University was awarded a $1 million grant for developing an innovative concept using CLT slabs with DELTABEAM® for this 2451 m² (26382 ft²) building.

Wood, concrete and steel all came together with the use of DELTABEAM® to increase ceiling height. An 11 m DELTABEAM® was a key design element to support a CLT shearwall.

“There are several unique features when it comes to DELTABEAM® combined with mass timber slabs” says Koralie St-Hilaire, Peikko Canada’s Project Engineer responsible for the project. “Large holes were introduced to the DELTABEAM® end plate to access mass timber connecting bolts” Koralie continues. Additionally, DELTABEAM® Composite Beams were produced with screw holes on the bottom flange to connect to the wood slab.   

Perrotte Architecte wanted a sense of openness to stimulate the free flow of unique physics innovations. DELTABEAM® enhances the design of curves and spiral staircases to communicate a sense of openness amongst the researchers.

 

Project Stakeholders: 

Sherbrooke University 

Saucier + Perrotte Architects 

Latéral Conseil 

Gératek Construction 

Ambiance Bois (mass timber supplier and erector) 

Czytaj więcej down-arrow.png

Informacje o projekcie

Wielkość projektu:
2451 m2
Wielkość projektu:
26382 ft2
Kondygnacje:
3
Deweloper:
Université de Sherbrooke
Generalny Wykonawca:
Gératek Ltée
Biuro konstrukcyjne:
Latéral
Architekt:
Saucier & Perotte Architectes
Zakład prefabrykacji:
Ambiance Bois
Rok realizacji dostaw:
2020
Zakończenie budowy:
2021

Dostarczone rozwiązania

Kontakt

Dominic Lemieux, P.Eng.

Dominic Lemieux, P.Eng.

Managing Director

Tel. (888) 734-5561 ext.500
Mob. 418-808-8007
[email protected]