Four Seasons Staff Housing, Dubai, UAE

  • Typ obiektu:
  • Budownictwo mieszkaniowe
Pełny ekran Zamknij Street View

Built in the heart of an active industrial area of Dubai, the Four Seasons Staff Housing project is a distinguishable building among the surrounding environment. The design’s original time and cost estimates were met by using Peikko's DELTABEAM® solution. 

 Consisting of two parallel buildings with a central connection, the H-shaped structure stands out with floor-to-floor windows built within concrete blocks. The original design featured cast-in-place concrete columns and cast-in-place post-tensioned slabs with external concrete block walls.

The design consists of precast insulated cladding panels, internal precast frames and walls, and Hollow Core Slabs with the following key features:
• Continuous insulation with no thermal breaks
• Flat slabs at cantilevers and corridors
• Fast construction
• Reduced internal finishes

In 2014, the project received Honorable Mention under the Multifamily Housing category at the prestigious PCI Awards. 

www.econstruct.ae

Czytaj więcej down-arrow.png

Informacje o projekcie

Wielkość projektu:
21000 m2
Kondygnacje:
5
Deweloper:
Bright Start LLC
Generalny Wykonawca:
Dubai Contracting Company
Zakład prefabrykacji:
e.construct
Rok realizacji dostaw:
2014
Zakończenie budowy:
2014

Kontakt

Nirajuthan Selvarajah

Nirajuthan Selvarajah

[email protected]